In short
- Bridge loans fund the gap until a property is stabilised, sold or refinanced.
- Construction loans fund in draws as work is completed and inspected.
- Both need a clear, tested take-out plan.
Commercial bridge financing
Bridge loans are short-term (often 6–24 months) and suit:
- Value-add projects – buy, renovate and lease up before long-term financing
- Vacancy – a building that won't yet qualify with a bank
- Timing – a closing date that can't wait for a conventional lender
- Partner buyouts or maturities that need fast funding
They're usually provided by private lenders, funds, some B-lenders and credit unions – at higher cost than long-term financing.
Construction financing
Construction loans fund in stages:
| Feature | How it works |
|---|---|
| Draws | Funds are released as work is completed, verified by a cost consultant or inspector |
| Holdbacks | A portion is held back as required under Ontario's construction lien rules |
| Interest reserve | Interest may be paid from the loan during construction |
| Equity first | Lenders typically require your equity to be in before their funds |
| Take-out | A permanent lender (often CMHC-insured for rentals) repays the construction loan |
What lenders look for
- Experienced builder and project team
- Detailed budget, schedule and contingency
- Permits, approvals and a realistic timeline
- Pre-leasing or market rent evidence
- A take-out lender or clear refinance path
Costs to budget
Higher interest rates than permanent loans, lender and brokerage fees, cost-consultant and legal fees, and the carrying cost of delays. Build in a contingency for both time and money.
Plan the take-out from day one
Run the numbers on the permanent loan before you start: stabilised NOI, DSCR and appraised value. If the take-out doesn't work on conservative assumptions, the project doesn't work.
A worked example: bridge, build, take-out
Illustrative only. A developer buys a site to build six townhomes.
| Stage | Financing |
|---|---|
| Land purchase | Private or bank land loan – often 50–65% of the land value |
| Construction | Construction loan advanced in draws as work is completed and inspected |
| Completion | Units sold, or a long-term mortgage (sometimes CMHC-insured) pays out the construction loan |
Each stage has its own lender requirements. Lining up the take-out early makes the construction lender far more comfortable.
Common mistakes to avoid
- No contingency. Budget overruns are common – lenders expect a contingency, often 5–10% of hard costs.
- Underestimating time. Permits, draws and inspections take longer than planned. Interest keeps running.
- Leaving the take-out to the end. Know how the construction or bridge loan will be repaid before you start.
Questions people ask
How do construction draws work?
The lender advances funds in stages as work is completed, usually after a cost consultant or appraiser confirms progress. You fund your equity first.
Can I get bridge financing for a commercial property?
Yes. Commercial bridge loans are common for acquisitions, repositioning or lease-up before a long-term mortgage – usually from private or specialty lenders.
Learn more: commercial mortgages in Ontario · CMHC MLI Select explained · DSCR explained
Questions about your situation?
Leave your details – I'll call you back, usually within one business day.
Principal Broker · FSRA #M12001646 · Credentials
Important: All mortgage financing is subject to lender approval, underwriting, property valuation, legal review and applicable regulatory requirements. Rates, fees and terms vary by lender and borrower and are not guaranteed. Information on this website is general and educational, and is not financial, legal or tax advice for your specific situation.